guide

What should a pro-forma invoice for bulk stone include?

What should a stone pro-forma invoice include? Stone name, grade, dimensions, thickness, finish, quantity, price, packing, transport, lead time and payment terms.

3 min readUpdated:
What should a pro-forma invoice for bulk stone include?

What should a pro-forma invoice for bulk stone include?

In a bulk order, a phrase such as "500 m² of white stone" is not enough to prevent disputes.

The bigger the order, the more precisely the details should be recorded.


1. Exact product name

Write the trade or quarry name as precisely as possible.

If there is a product code or SKU, add it.


2. Grade

State whether it is:

  • Super
  • Premium
  • First grade

or what the supplier's own definition is.

A grade should not be just a name; it should come with a reference sample or approved photos.

See how to choose the right stone grade.


3. Product form

State whether the order is:

  • slabs
  • tiles
  • strips
  • stairs
  • blocks

4. Dimensions

For example:

  • 40×40
  • 60×60
  • 40 cm strips
  • slabs with approximate dimensions

Dimensional tolerance matters in professional orders.


5. Thickness

Record the nominal thickness and, if needed, the tolerance.


6. Finish

For example:

  • Polished
  • Honed
  • Flamed
  • Leather
  • Bush-hammered

The finish must be named.


7. Area or quantity

Write the exact order quantity.

For slabs, both the number of slabs and the area may be recorded.


8. Unit price

State whether the price is:

  • per square metre
  • per tonne
  • per slab
  • per pallet

9. Currency and tax

For domestic or export orders, the currency and tax must be stated.


10. Packing

Record the type of packing:

  • pallet
  • A-frame
  • crate
  • bundle

11. Place of delivery

State whether delivery is:

  • ex-factory
  • from a warehouse
  • to the project city
  • to a port

12. Transport cost

Is it included in the price or separate?

This must be explicit.


13. Lead time

For produced shipments, record the approximate delivery time.


14. Payment terms

For example:

  • advance payment percentage
  • second-stage amount
  • settlement before loading

15. Quality control

If you need photos, video or an inspection before shipment, state it from the start.


16. Breakage and shortage terms

Responsibility for:

  • loading
  • transit
  • unloading

must be clear.


17. Top-up supply

If the project has several phases, record the repeat-supply arrangement, even though a perfect match is not always possible with natural stone.


Sample pro-forma structure

FieldValue
Product
Grade
Format
Size
Thickness
Finish
Quantity
Unit price
Packaging
Delivery
Lead time
Payment

Why these details matter

Disputes usually start where buyer and seller had different definitions of grade, dimensions, quality or delivery.


Summary

A good pro-forma invoice defines the order so clearly that a third party could understand exactly what must be delivered.

See also how to compare stone prices between suppliers.

Frequently asked questions

Should sample photos be attached?

For important orders, yes; it is very useful.

Should the grade be written down?

Yes.

Should the transport cost be stated?

Always.

Does the delivery time matter?

Yes, especially for scheduled projects.